Municipal waste incineration plants from 1974 to 1989
Photo/Pics Orderers Commission Year
  Municipality of Winterthur, Switzerland Project extension municipal waste incineration plant 2. units boiler and turboset 1989
  Municipality of St. Gallen, Switzerland Planning, construction management  for the extension of the municipal waste incineration plant  St. Gallen 1983-1989
  Association for waste removal south east Bavaria Traunstein, Germany Project extension municipal waste incineration plant of 250'000 t/y for the region of 760'000 inhabitant 1987-1989
MHKW Coburg Association north-west Oberfranken, Kronach, Germany General planning and overall project management for the construction of a municipal waste incineration plant, hospital waste and sewage sludge incineration power plant - Coburg 1985-1989
  ABB Asea Brown Boveri, Switzerland Implementation planning project plant to melting of fly ash 1988
  Municipality of Zurich, Switzerland Feasibility study  waste water deduction  municipal waste incineration plant of "Hagenholz" thru the district heating 1988
HAGENHOLZ Anlagenschema Municipality of Zurich, Switzerland Feasibility study of the flue gas cleaning incl. denox of the  municipal waste incineration plant Hagenholz 2 units,  110'000 nm3/h flue gas per line 1988
  Municipality of Zurich, Switzerland Approval and comparing of thr flue gas cleaning 2 units  110'000 nm3/h flue gas per line, with waste water treatment and deduction 1987
  Association for waste removal south east Bavaria Traunstein, Germany Project  for a municipal waste incineration plant  with 3 boiler plants 300 t/day with a steam output per line , 2 x 4,2 MW turboset 1986-1987
  Association  Toggenburg Hinterthurgau, Switzerland Planning, construction management  for the  extension of the municipal waste incineration plant of Bazenheid 1983-1985
  Company  Municipality  Coburg, Germany Tender, offer and to allocate a municipal waste incineration plant of 100'000 t/y - execution for the approval 1985
  Municipality Coburg, Germany Project municipal waste incineration plant 100'000 t/y and coal fired central heating station   (in co-operation Siemens / Ecoling) 1984
 Bazenheid Abstimmungsprojekt Association for waste removal Toggenburg Hinterthurgau, Switzerland Project for the extension of the municipal waste incineration plant of Bazenheid 1982
 Widnau Association for waste removal  Rheintal, Switzerland Project for a waste incineration plant100 t/day Widnau 1981
 Abstimmungsprojekt St. Gallen 1980 Municipality of St. Gallen, Switzerland Project for the renewal of the waste incineration plant 1980
  Municipality of Winterthur, Switzerland Project for a emulsions separation plant  1980
  Geilinger AG, Switzerland Planning of a offer for a incineration of sieveb remaining parts of a wast compost plant 1980
  Association for waste removal  AU, Rheintal, Switzerland Project for a waste incineration plant 2 x 100 t/day 1980
Kufstein Municipality of Kufstein, Austria Kufstein Project for a waste incineration plant , 2 Kessel 
144 t/day per line with enercy, haeting district and wate compressing
1980
  Municipality of Coburg, Germany Conceptual design for a waste incineration plant 2 x 240 t/day with electrical energy production and district heat supply 1979
  BBC, Brown Boveri, Switzerland Project for a  waste incineration plant
2 x 375 t/day with electrical energy production
1979
KVA Winterthur 1979 Municipality of Winterthur, Switzerland Site management and construction planning, for the of the municipal waste incineration plant extension   Winterthur with a boiler unit 300 t / day with 10 MW turboset with air cooled condensor 1975-1979
  Sandoz AG, Basel, Switzerland Planning and execution dual-rail weight bridge, Sandoz 1978
  Industrien Conceptual design for 2 municipal waste plants with flow-rate of 1'500 t/day with generation of electricity in Athens / Greece 1978
 Lima BBC, Brown Boveri, Switzerland Planning municipal waste incineration plant  Lima, waste-throughput 1'500 t/day, 20 MW - Turboset 1978
  Association for waste removal Bazenheid, Switzerland Supervision of fabrication and commissioning and planning municipal waste incineration plant  - Bazenheid and the district heating 1974-1978
  Association  region of waste water Olten, Switzerland Feasibility study  about the redevolopment of the composting plant Olten 1977
  Association Uri, Switzerland Feasibility study for a waste delivery station with carriage by rail, capacity 10'000 t/y 1977
  Association  Uri, Switzerland Feasibility study for municipal waste plant with 2 x 100 t/day in Schattdorf with industrual power utilization 1977
 KVA Winterthur Bauprojekt 1974 Municipality of Winterthur, Switzerland Feasibility study  for the 1. extention of the municipal waste plant - Winterthur with estimate of costs, economic feasibility study of  the district heating 1974

  Description
  Municipal waste incineration plants from:  1990 to 2000