| Municipal
waste incineration plants from 1974 to 1989 |
| Photo/Pics |
Orderers |
Commission |
Year |
|
| Municipality of
Winterthur, Switzerland |
Project extension
municipal waste incineration plant 2. units boiler and turboset |
1989 |
|
| Municipality of St.
Gallen, Switzerland |
Planning, construction
management for the extension of the municipal waste incineration
plant St. Gallen |
1983-1989 |
| |
Association for
waste removal south east Bavaria Traunstein, Germany |
Project extension
municipal waste incineration plant of 250'000 t/y for the region of
760'000 inhabitant |
1987-1989 |
 |
Association
north-west Oberfranken, Kronach, Germany |
General planning and overall
project management for the construction of a municipal waste incineration
plant, hospital waste and sewage sludge incineration power plant - Coburg |
1985-1989 |
| |
ABB Asea Brown
Boveri, Switzerland |
Implementation
planning project plant to melting of fly ash |
1988 |
| |
Municipality of
Zurich, Switzerland |
Feasibility study
waste water deduction municipal
waste incineration plant of "Hagenholz"
thru the district heating |
1988 |
 |
Municipality of
Zurich, Switzerland |
Feasibility study
of the flue gas cleaning incl. denox of the municipal
waste incineration plant Hagenholz 2
units, 110'000 nm3/h flue gas per line |
1988 |
|
| Municipality of
Zurich, Switzerland |
Approval and
comparing of thr flue gas cleaning 2 units 110'000 nm3/h flue gas
per line, with waste water treatment and deduction |
1987 |
| |
Association for
waste removal south east Bavaria Traunstein, Germany |
Project for a
municipal waste incineration plant with 3 boiler plants 300 t/day
with a steam output per line , 2 x 4,2 MW turboset |
1986-1987 |
| |
Association
Toggenburg Hinterthurgau, Switzerland |
Planning,
construction management for the extension of the municipal
waste incineration plant of Bazenheid |
1983-1985 |
| |
Company
Municipality Coburg, Germany |
Tender, offer and
to allocate a municipal waste incineration plant of 100'000 t/y -
execution for the approval |
1985 |
|
| Municipality
Coburg, Germany |
Project municipal
waste incineration plant 100'000 t/y and coal fired central heating
station (in co-operation Siemens / Ecoling) |
1984 |
 |
Association
for waste removal Toggenburg Hinterthurgau, Switzerland |
Project for the
extension of the municipal waste incineration plant of Bazenheid |
1982 |
 |
Association
for waste removal Rheintal, Switzerland |
Project for a waste
incineration plant100 t/day Widnau |
1981 |
 |
Municipality
of St. Gallen, Switzerland |
Project for the
renewal of the waste incineration plant |
1980 |
| |
Municipality
of Winterthur, Switzerland |
Project for a
emulsions separation plant |
1980 |
| |
Geilinger AG,
Switzerland |
Planning of a offer
for a incineration of sieveb remaining parts of a wast compost plant |
1980 |
| |
Association
for waste removal AU, Rheintal, Switzerland |
Project for a waste
incineration plant 2 x 100 t/day |
1980 |
 |
Municipality
of Kufstein, Austria |
Kufstein Project
for a waste incineration plant , 2
Kessel
144 t/day per line with enercy, haeting district and wate compressing |
1980 |
| |
Municipality
of Coburg, Germany |
Conceptual design
for a waste incineration plant 2 x 240 t/day with electrical energy
production and district heat supply |
1979 |
| |
BBC, Brown Boveri,
Switzerland |
Project for a
waste incineration plant
2 x 375 t/day with electrical energy production |
1979 |
 |
Municipality
of Winterthur, Switzerland |
Site management and
construction planning, for the of the municipal
waste incineration plant extension Winterthur with a boiler
unit 300 t / day with 10 MW turboset with air cooled condensor |
1975-1979 |
| |
Sandoz AG, Basel,
Switzerland |
Planning and
execution dual-rail weight bridge, Sandoz |
1978 |
| |
Industrien |
Conceptual design
for 2 municipal waste plants with flow-rate of 1'500 t/day with generation
of electricity in Athens / Greece |
1978 |
 |
BBC, Brown Boveri,
Switzerland |
Planning municipal
waste incineration plant Lima, waste-throughput 1'500 t/day, 20
MW - Turboset |
1978 |
|
| Association for
waste removal Bazenheid, Switzerland |
Supervision of
fabrication and commissioning and planning municipal waste incineration
plant - Bazenheid and the district heating |
1974-1978 |
| |
Association
region of waste water Olten, Switzerland |
Feasibility study
about the redevolopment of the composting plant Olten |
1977 |
| |
Association Uri,
Switzerland |
Feasibility study for
a waste delivery station with carriage by rail, capacity 10'000 t/y |
1977 |
| |
Association
Uri, Switzerland |
Feasibility study
for municipal waste plant
with 2 x 100 t/day in Schattdorf with industrual power utilization |
1977 |
| Municipality
of Winterthur, Switzerland |
Feasibility study
for the 1. extention of the municipal waste plant - Winterthur with
estimate of costs, economic feasibility study of the district
heating |
1974 |